1828 results for "1":
This expedition was unlucky in failing- to achieve its objective - the ascent of Meru - owing to the early onset of the Himalayan winter. The N approach to the Meru-Shivling Col was found to be expose Read more
A portion of the expedition drove overland to Kishtwar, meeting the rest of the expedition team there before beginning the trek to the Brammah glacier. Base camp was established and acclimatisation be Read more
After a long overland journey from the UK, the expedition achieved the first ascents of Marble Cake Mountain (5620m), Koh-i-Corner (5752m), Koh-i-Farda (5420m), Koh-i-Crystal (5700m), Koh-i-Parrendah Read more
After travelling overland to Nepal in a newly-purchased Ford Transit, the expedition left Kathmandu on 17 September, reaching the site of their base camp in Gokyo 17 days later. After two weeks spent Read more
A study of high altitute subsistence agriculture in the Intag Valley and the area surrounding Nariano Acosta. Read more